description:
|
I95 Interchange Studies to include feasibility of Collector-
distributor (CD) Lanes in both directions between Exit 130 and new
access points (Harrison Road (620) & Courthouse Road (208) and
include North Bound CD lanes between Route 3 and US 17 (NB)
Rappahannock River Crossing project). A potential new
interchange south of Exit 126 and additional Exit 126 improvements
including to the Interstate Ramp. Alternative 3 (Improvements to
US 1 and Southpoint Parkway), Exit 126 to US 1 ramp and signal
improvements or other recommendations from the KH Interchange
Modification Report and companion Planning Study. This data is presented as part of the 2020 Comprehensive Plan Transportation Chapter, specifically the Thoroughfare Plan. |