{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "", "description": "I95 Interchange Studies to include feasibility of Collector-\ndistributor (CD) Lanes in both directions between Exit 130 and new\naccess points (Harrison Road (620) & Courthouse Road (208) and\ninclude North Bound CD lanes between Route 3 and US 17 (NB)\nRappahannock River Crossing project). A potential new\ninterchange south of Exit 126 and additional Exit 126 improvements\nincluding to the Interstate Ramp. Alternative 3 (Improvements to\nUS 1 and Southpoint Parkway), Exit 126 to US 1 ramp and signal\nimprovements or other recommendations from the KH Interchange\nModification Report and companion Planning Study. This data is presented as part of the 2020 Comprehensive Plan Transportation Chapter, specifically the Thoroughfare Plan.", "summary": "", "title": "I95 Interchange Study Area**", "tags": [], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 0, "maxScale": 0, "spatialReference": "", "accessInformation": "Spotsylvania County Planning Department", "licenseInfo": "" }